Wednesday, December 15, 2010

L E S S   M E S S

......................................................................
yesterday our plumber came and worked his butt off to do more in a day
than most people do in a week! He replaced 2 floors of waste line, replaced all of
our 2nd floor tenants bathroom plumbing from below, installed all the venting, installed
the new kitchen faucet drain piping, and had a few meetings throughout the day. whew!
his work is really well done, though not pretty.

here's some shots of the new lines and the old waste pipes sitting in our backyard. now i see why the drains were so slow. for one thing they had so much old gunk in them...and about 6 feet of wire someone tried to snake the drain with...which then snapped on them.
i knew it couldn't just be all my hair slowing those drains!






......................................................................