......................................................................
It seems like we've been at it for so long already...but when i just typed 2.5 weeks i think it's great progress! I guess when you're living in the middle of a major renovation and it's filth, it gets old fast. this little kitchen/bathroom reno has taken up our entire house! we thought we'd have our downstairs bedrooms as our safe dust-free haven but then our plumber told us he had a lot of work to do in our large bedroom closet which is where alot of plumbing runs through. so the entire closet had to be emptied into the second bedroom which was packed to the ceiling with stuff already. this is also where our 2 cats are locked up during the day.
so downstairs is mess.
upstairs, where the actual work is happening is a wreck. with our dining room and living room right outside the kitchen this has become a real work zone with appliance storage, central command/work table (with tools & plans), 2x4 storage, the plumbers entire van load of pipes, fittings, doo dads, connectors, and ominous looking tools...etc.
i am learning great patience in this process...and even with the mess i am grateful that we can even do this ;-)
......................................................................
Can't wait to see it done!
ReplyDeleteIts really happenin'!!