P R O G R E S S


......................................................................
i'm late to post the 'action' from earlier this week.
the upper cabinets went in along with the microwave that is above the stove.
our contractor kindly covered all the painted cabinet edges in blue tape so nothings gets scratched while work is going on, and speaking of blue, the floor is currently coated in a blue waterproof membrane and waiting for the cork to be installed.
the backsplash tile has been installed but not grouted.
our countertop was templated on monday and is being installed on saturday...can't wait!
last week new windows went in...after alot of drama and waiting i was a little disappointed with them but after everything is done and trimmed and gorgeous i'm sure they'll be fine. anythings better than the  "1972 brown aluminum,  clouded over glass, wont stay open with a 2x4 underneath"  windows that were in there before!


......................................................................